From specification to water test.

A controlled sequence connects design decisions, fiberglass construction, surface finishing, installation, inspection and shipment preparation.

01–06Controlled stages
30–60Typical days
FiberglassPrimary material
WaterFinal testing
Jetcar Kromh product structure
Built to order

The final build starts with a confirmed specification.

01

Specification

Model, power package, finishes, options and intended destination are confirmed.

02

Mould & fiberglass

The structural body is produced using the appropriate mould and fiberglass process.

03

Surface & paint

Surface preparation, selected color application and finishing are completed.

04

Assembly

Interior, steering, electrical, accessories and mechanical systems are installed.

05

Inspection & testing

The completed unit is inspected and prepared for the required water testing.

06

Delivery preparation

Protection, documentation and transport or shipment coordination are completed.